
Spillway with gates open 1 foot - March, 2001 |
|
Land acquisition for Toledo Bend Reservoir began in May, 1963. Construction of the dam, spillway, and power plant was initiated in April, 1964. The closure of the earthen embankment and impoundment of water was begun in October, 1966. The power plant was completed and began operating in early 1969. There are no dates for the photos, but since construction began in April, 1964 and water impoundment began in October, 1966 - we know these photos fall within that time frame. The photos are arranged chronologically for the power plant and for the spillway - from left to right. These photos were captured by digital camera from the originals at the Sabine River Authority, State of Louisiana Engineering Office.
For some history on the Toledo Bend Dam and Toledo Bend Reservoir, see the Newton County section of the site
Aerial views of Toledo Bend and surrounding area have been added to the Webmaster's Gallery - CLICK HERE to check them out
|
Click on any image
for an enlargement
in a new
browser window |
|
|
|
| Power Plant - Generator |
|
|
|
|
| Power Plant - Generator |
|
|
|
|
| Power Plant - Generator |
Dam Site |
Spillway |
|
|
|
|
| Spillway |